Scheme title: Redcliff Quarter (Phase 2), land at Redcliff Street, Three Queen Lanes and St Thomas Street
Date reviewed: 11 August 2015

Scheme promoter: Bilfinger GVA

Description: This submission relates to emerging proposals to redevelop the site, for mixed use development, with commercial uses at ground floor level and residential units on upper floors. The emerging development proposals seek to demolish the majority of the buildings upon the site and replace them with residential units (use class C3) over commercial uses including uses within classes A3 (retail), B1 (office), and C1 (hotel) at ground level. Parking will be provided at basement level.

Scheme title: Bedminster Green (Masterplan for areas surrounding St Catherines Place), Bristol, BS3 4HG
Date reviewed: 11 August 2015

Scheme promoter: Origin3 Studio

Description: Following the successful planning outcome for the St Catherines Place project that was presented to BUDF in 2014, a wider regeneration area has been identified on the land surrounding and to the south of Malago Road in Bedminster. When complete, the £100 million regeneration – which developers are now calling Bedminster Green – could deliver up to a total of 800 new homes, including 250 affordable. The redevelopment would see a district heating system, a new entrance and plaza to Bedminster train station and significant highways improvements incorporating Metrobus interchange, as well as new landscaped open spaces and green infrastructure.

Scheme title: Queen Victoria House, Redland Hill, Redland
Date reviewed: 9 June 2015

Scheme promoter: Pegasus Planning Consultants

Description: Demolition of single storey extension and the conversion of existing building and erection of new accommodation to provide assisted living development for older people comprising apartments integrated with communal and support facilities, car parking and landscape works.

Scheme title: St George’s, Great George Street, BS1 5RR
Date reviewed: 9 June 2015

Scheme promoter: Patel Taylor

Description: Refurbishment and new extension building and landscape to St George’s Church providing additional facilities and space to the St George’s Bristol concert venue.

Scheme title: Factory No 1 – Regent House, Consort House and Imperial Arcade, East Street, Bedminster
Date reviewed: 9 June 2015

Scheme promoter: JLL

Description: The details of the proposed development are still being refined but the scheme can be summarised as the conversion of the existing office elements of Regent House and Consort House (B1 (a) use) to approximately residential (C3 use) (approximately 100 units) and the construction of new build residential (C3 use) development on the existing car park and the surplus land on Lombard Street (approximately 176 units).

Page 10 of 26« First...89101112...20...Last »


Supported by